Dublin vs Walnut Creek

Dublin carries an effective property tax rate of 1.24% of assessed value and Walnut Creek carries 1.09%, both for fiscal year 2025-26. On one identical reference loan the monthly carrying costs are $9,942 and $9,749 — $193 apart, with Walnut Creek lower. To Oakland City Center at AM peak the fastest published commutes are 38 min by BART from Dublin and 27 min by BART from Walnut Creek. Every figure is an objective public metric or arithmetic on one, and names its source.

Dublin (Alameda County) · Walnut Creek (Contra Costa County)

Side by side
Metric Dublin Walnut Creek Difference
Median $/sqft (SFR)$720$800−$80
Effective tax rate1.24%1.09%+0.14 pts
Monthly cost, reference loan (insurance held at $2,400/yr; fire-zone premiums can be far higher)$9,942$9,749+$193
FiDi SF (Montgomery St BART) — BART55 min45 min+10 min
FiDi SF (Montgomery St BART) — Drive65 min55 min+10 min
Oakland City Center (12th St BART) — BART38 min27 min+11 min
Oakland City Center (12th St BART) — Drive40 min32 min+8 min
Sunnyvale / Mountain View (Sunnyvale Caltrain) — Drive45 min62 min−17 min

Difference is Dublin minus Walnut Creek. Sources are cited on each submarket page.

Differences are computed from unrounded rates, so they can differ by 0.01 from the rounded rates shown.

17 minutes each way to Sunnyvale / Mountain View (Sunnyvale Caltrain) is what actually separates Dublin from Walnut Creek; Dublin holds that side. Both are billed within 0.14% of each other, 1.24% to 1.09%.

Square footage per dollar

East Dublin comps run $580-$650 per square foot; west Dublin runs $650-$700. Northgate, Woodlands and Rudgear Estates hold Walnut Creek's four-bedroom stock. At $720 and $800 per foot respectively, a fixed budget buys about 11% more floor area in Dublin.

The monthly, matched

Modelled the same way in both ($1,600,000 purchase, 20% down, 6.5% fixed, $2,400 insurance, dues excluded), Dublin totals $9,942 a month at 1.24% and Walnut Creek $9,749 at 1.09% — tax lines of $1,651 and $1,458. Dublin CFDs push effective rates to 1.3-1.5 percent, and some run through 2040 or later. Which district a Walnut Creek parcel falls in changes the fixed levy, so the bill has to be pulled. Neither figure includes dues or a district assessment, and both belong on the worksheet before an offer.

The trip each morning

To Sunnyvale / Mountain View (Sunnyvale Caltrain): 45 minutes by driving from Dublin, 62 by driving from Walnut Creek — a 17-minute edge to Dublin, or 2.8 hours across a ten-trip week. To Oakland City Center (12th St BART): 38 minutes by BART from Dublin, 27 by BART from Walnut Creek — a 11-minute edge to Walnut Creek, or 1.8 hours across a ten-trip week. Door-to-door from Dublin to FiDi is 75-90 minutes. Highway 24 from Walnut Creek hits the Bay Bridge in 30 minutes at 6 a.m., 60-75 at 8.

What the disclosure stack holds

The Tassajara Hills tracts on Dublin's northeast edge sit at the boundary of moderate fire mapping. Creek flooding along Walnut Creek and San Ramon Creek appears on the NHD for lower lots. Run the address through CAL FIRE's severity-zone viewer, the FEMA Flood Map Service Center and the CGS seismic hazard maps, and treat the premium quote as a contingency item.

Which search this actually is

Dublin assumes a CFD and a long train ride are both acceptable. Walnut Creek covers a four-bedroom-with-pool need without a hillside insurance file. The decision is which requirement is load-bearing, because neither submarket satisfies both lists.


Sources. Rate and payment figures: Alameda County Tax Rates by TRA FY 2025-26; Contra Costa TRA Book FY 2025-26, as composited in build/assets/metrics.json — Dublin: County FY 2025-26 rate book, TRA 26-001; Walnut Creek: County FY 2025-26 rate book, TRA 09000, so read the bill. Minutes shown are AM-peak and door-to-door, from data/commute/static.csv. Price per square foot is a trailing median and is not an appraisal. Qualitative detail is from Manuel Wilhite's field notes.

Compare any two places

Dublin detail

Property tax rate — FY 2025-26
ComponentRate of assessed value
1% general levy1.000%
County & city bonds0.0084%
School bonds0.1913%
Special districts0.0388%
Effective rate1.24%
Tax-rate areaTRA 26-001
Mello-Roos / CFD None recorded (parcel-specific; verify by APN)

Source: Alameda County Auditor-Controller, Tax Rates for the Fiscal Year 2025/2026, p. 264 (Alameda County), TRA 26-001 at the submarket's map point, composited in build/assets/metrics.json.

FiDi SF (Montgomery St BART) — BART55Drive65Oakland City Center (12th St BART) — BART38Drive40Sunnyvale / Mountain View (Sunnyvale Caltrain) — Drive45
Dublin door-to-door commute, AM peak, in minutes. Rail and ferry in gold, driving in brown. Source: data/commute/static.csv.

Walnut Creek detail

Property tax rate — FY 2025-26
ComponentRate of assessed value
1% general levy1.000%
County & city bonds0.000%
School bonds0.0774%
Special districts0.0163%
Effective rate1.09%
Tax-rate areaTRA 09000
Mello-Roos / CFD None recorded (parcel-specific; verify by APN)

Source: Contra Costa County Auditor-Controller, Detail of Tax Rates 2025-2026 (October 2025), p. 131 (Contra Costa County), TRA 09000 at the submarket's map point, composited in build/assets/metrics.json.

FiDi SF (Montgomery St BART) — BART45Drive55Oakland City Center (12th St BART) — BART27Drive32Sunnyvale / Mountain View (Sunnyvale Caltrain) — Drive62
Walnut Creek door-to-door commute, AM peak, in minutes. Rail and ferry in gold, driving in brown. Source: data/commute/static.csv.

Dublin vs Walnut Creek: questions and answers

Which has the lower effective property tax rate, Dublin or Walnut Creek?
Walnut Creek, at 1.09% of assessed value against 1.24% for fiscal year 2025-26 — a gap of 0.14 pts. Rates are composited from county tax rate books; each parcel bill governs.
How much do monthly carrying costs differ between Dublin and Walnut Creek?
$193 per month on the identical reference loan: Dublin $9,942, Walnut Creek $9,749. Walnut Creek is lower. Principal and interest are held constant, so the difference is the tax line. Insurance held at $2,400/yr; fire-zone premiums can be far higher. Arithmetic only.
Which has the shorter commute to Oakland City Center, Dublin or Walnut Creek?
Walnut Creek. Dublin is 38 min by BART; Walnut Creek is 27 min by BART. Door-to-door, AM peak. Source: data/commute/static.csv.
What is the price per square foot difference between Dublin and Walnut Creek?
$80 per square foot: Dublin $720, Walnut Creek $800. Single-family medians, trailing twelve months. A median is not a valuation of any specific property.

Contact Manuel